Утепление
05 апреля 2018

If possible, then the guides should be made of such lengths that they are located above a few indigenous neck; This helps to obtain more alignment of all indigenous necks and accelerates their processing, since the grinding machine is moved from one processed neck to another without reinstalling.

05 апреля 2018

The result of these calculations should not exceed the permissible (according to technical conditions) the cone of the neck.

05 апреля 2018

After that, the carriage is moved in the longitudinal direction and monitor the indications of the indicator.

05 апреля 2018

Checking the parallelity of moving the carriage of the side surface of the 27th foundation frame is carried out in the following way.

05 апреля 2018

The concrete solution is poured simultaneously around the entire perimeter of the building.

05 апреля 2018

The thickness of the supports should correspond to several centimeters that will raise the reinforcing mesh from the lower plane of the formwork.

05 апреля 2018

Reinforcement of the upper strapping beam is carried out by an iron reinforcing rod with a cross section of at least 20-30mm.

05 апреля 2018

The guarantee of the fortress should be impeccable.