Утепление
11 апреля 2018

Renting an excavator of a loader allows you to use it even to those construction companies that do not have their own special equipment park.

11 апреля 2018

The durability of buildings that are erected from shipbuilding concrete is guaranteed within 100 years.

11 апреля 2018

The small thickness of the walls themselves positively affects the size of the useful area in the room.

11 апреля 2018

Thus, a strong seamless shell will be obtained.

11 апреля 2018

The floor panels are laid on the frame of the walls and the supports are temporarily installed, and then the joints are reinforced with the angles of the walls and ceilings, after which the concrete is applied.

11 апреля 2018

The walls that are created using this technology have a much greater bearing capacity.

11 апреля 2018

A gap of 100 millimeters is left between the panel and wall of the pit, which will be sufficient for fragmentation.

11 апреля 2018

During the use of panels for non -removable formwork «Sota», the construction of the house can be started with the basement floor, you only need to concrete a monolithic tape with a section of 300×250 millimeters and with reinforcing issues designed to install panels.