Many of the cranes below are no longer produced by industry, and therefore, construction organizations in some cases willingly transfer the cranes of old structures that they have for repair and construction organizations.

16 апреля 2018

These brands of cranes are not always suitable for new construction, because they do not satisfy the lifting capacity of the increased weight of the mounted elements, but for major repairs such taps can be successfully used.

16 апреля 2018

For major repairs, the same tower cranes with a carrying capacity of 0.5 to 3.0 tons are used, as for the new construction.

16 апреля 2018

Elements weighing up to 100 kg can be stacked manually.

16 апреля 2018

To raise such elements, cranes and lifts with a carrying capacity of up to 0.5 g are used, and installation is carried out using KP-0.6 cranes.

16 апреля 2018

For the installation of such ceilings, tower cranes with a carrying capacity of 1.5-3 g are used.

16 апреля 2018

Dismantling in this case is carried out from top to bottom, from roof to basement, and the installation of new structures is carried out from the bottom up, from the basement to the roof.

16 апреля 2018

These designs are suitable mainly during complex overhaul, when existing internal structures are completely dismantled and the roof is completely disassembled.