Утепление
18 апреля 2018

All distances are measured by roulette for two passes from opposite points, and the actual length is calculated as the average arifmatic of two results.

18 апреля 2018

A nail is driven into the end of the wooden peg, which determines this point.

18 апреля 2018

And also the territory that will be laid with tiles or paved.

18 апреля 2018

Then, the position of all future walls of the building is fixed on the site, both external and internal, under which the foundation will be poured.

18 апреля 2018

If the plan provides not a rectangular shape of the building, then not two, but a larger number of points should be fixed with markings.

18 апреля 2018

Then, in accordance with the plan of the house in the boundaries of the site, points A and B are outlined on the previously chosen side.

18 апреля 2018

The transfer of the boundaries of the site to the «nature» is performed using geodetic instruments: theodolites, levels, rolls, slats.

18 апреля 2018

Earthwork is started only after marking the main buildings of the house on the site and the devices of the outskirts.