Утепление
08 мая 2018

The laying of the laminate continues until the end of the premises, guided by the above principles of work.

08 мая 2018

Excess glue is removed. Lay 3 and 4 panels 1 and 2 rows, etc.

08 мая 2018

The panel is shot down in the required place.

08 мая 2018

2. Laying 2 rows of panels is carried out in the length of the length of the panel of 1 row or with a displacement of 35 cm.

08 мая 2018

To increase the density of the connection of the sutures, the panels are knocked down through the bar with a hammer.

08 мая 2018

Min. gap = (width. premises, m × 1.5), mm

08 мая 2018

Install breakdown bars between the walls and the panel, which are necessary to create a gap that provides the ability to coating and narrow.

08 мая 2018

1. Laying 1 row — carried out from the left and the most distant angle regarding the entrance.