Утепление
11 мая 2018

Installation for the preparation of sulfuric acid iron is as follows.

11 мая 2018

The installation for the preparation of lime milk consists of a bunker with a screw, a dositor bunker with a screw, mixers and dispensers.

11 мая 2018

Mixer, capacity, dispensers and reinforcement are similar to the described above.

11 мая 2018

The mixer is a vertical device with an open -type turbine mixer designed to work with aggressive products.

11 мая 2018

Agree that you can’t do without Shvonazchik on the construction site where there is no supply of electricity.

11 мая 2018

Immediately before concreting, do not forget to align the pillars by level.

11 мая 2018

Next, install metal pillars 50×50 millimeters.

11 мая 2018

You should start with digging holes at a distance of 2-2.5 meters from each other.