The second category is a category, in case of violation of the power supply of which, there is a simple public transport, and industrial transport, simple mass production, mechanisms and workers occurs.

18 мая 2018

The first and most important is a category, in case of violation of the power supply of which, a threat of human life arises, significant damage is caused to the most important production processes, and there is a threat to the state.

18 мая 2018

ABR should work without any malfunctions, because the stress throughout the object depends on its reaction.

18 мая 2018

What is expected from ABR. ABR should be triggered with any reason for the power outage, within no more than 0.8 seconds.

18 мая 2018

And when electricity appears in the main network, the ABR switches from the generator to the main network.

18 мая 2018

But recently, the ABR began to be installed in private houses, because people do not imagine life without electricity.

18 мая 2018

If necessary, he gives signals to the power part — contactors and automatic machines.

18 мая 2018

ABR consists of three main nodes — this is a block of logic, a relay control unit of the generator and the power part.