The installation and commissioning of technological equipment in the short time, labor productivity growth is facilitated by the accurately in the established time, complete supply of equipment with pipelines and structures made by machine -building plants with high quality and high degree of factory readiness, and timely construction readiness of foundations, buildings and structures contribute By the beginning of the receipt and installation of equipment, as well as the use of the scientific organization of labor, clear management, the correct solution of the mechanization of installation processes that ensures the optimal number of mechanisms, the maximum possible loading of them and thereby the minimum short period of their participation in the construction of the facility.