Gravel recommends 5-10
08 мая 2018
Consumption for 1 m3 of concrete: brand cop 400-185 kg, gravel — 1787 kg, water — 81 liters. Gravel recommends 5-10 mm fractions.
The technology of laying pipeline is no different from laying sewer small -piece concrete pipes.



