Go beyond the limits
26 апреля 2018
Thus, the contractor was the main organizational unit in construction.
This system was possible in a period when — the size and nature of the built buildings and structures did not require cooperation of several organizations and did not go beyond the limits of the structures mastered by Russian technology.



