For pouring the

05 апреля 2018 Рубрика: Утепление

Throughout the perimeter of the building between the pillars, formwork is created for pouring the binding beam of the upper floor of the building. The formwork for the upper inter -story strapping beam is created from boards with a cross section of at least 40 mm.

Последние записи