End of
30 марта 2018
Therefore, when conducting work, it is necessary to leave installation gaps at the joints between the sheets within 1-2 mm.
It is more advisable to carry out sheets at the end of construction work related to the creation of high humidity in the room, such as floor concreting or wall plaster.



