Control and
18 апреля 2018
For butt welding, a daily extension test and a gap in an amount of at least 1% of the number of cooked joints is required.
Within the above mandatory minimum of operational control of materials, processes and products during reinforcement work, the department of technical control and the laboratory of the plant conducted documentary reports.



