And poured with

27 апреля 2018 Рубрика: Утепление

It is natural that any contractor needs to save as much as possible during construction work. In the event that the pillar is clogged, there is no need for the acquisition and delivery to the place of construction of sand and crushed stone, which would be required if the pillars were buried and poured with a special concrete mixture.

Последние записи