Layer, leave
27 июня 2018
After applying the third layer, leave the floor to dry for three days.
After drying the floor, be sure to wash it with ordinary water so that the traces of the Olifa do not stay.
After applying the third layer, leave the floor to dry for three days.
After drying the floor, be sure to wash it with ordinary water so that the traces of the Olifa do not stay.