Entire area of
08 июня 2018
One end of the screed is installed at the highest point of the old floor, the rest of the guides are aligned under this level along the entire area of the room.
One end of the screed is installed at the highest point of the old floor, the rest of the guides are aligned under this level along the entire area of the room.