Made by two -layer

07 июня 2018 Рубрика: Утепление

The floor is usually made by two -layer. The first, so to speak, Chernova is performed on logs 150 x 40 mm laid out after 60 cm. The upper, “front” floor is creeped from a dodgy board with a thickness of 25 to 40 mm, and the gaps between these two floors are insulated with roll mineral wool.

Последние записи