A special
28 мая 2018
Each new layer should be well tamped with a special wooden tamping, but it is best to use a special vibrator in this case. The formwork after seven days is dismantled, and all the walls of the foundation outside should be smeared with bitumen mastic, and roofing material is glued on top in order to perform waterproofing.



