The overlap on

27 апреля 2018 Рубрика: Утепление

As a result, it was necessary to first dismantle it. The owner of the road has studied the methods, risks and the cost of demolition of the bridge in order to find a solution that ensures the shortest time for the overlap on the road.

Последние записи