To the hopper
11 мая 2018
Before the hopper, the installation of crushing is installed.
Installation for the preparation of a solution of calcium chloride is as follows. School of calcium chloride from the bunker with a screw is supplied to the hopper-dositor, where, upon reaching the given weight, salts are triggered by tensometric sensors and the lane drive is turned off.



