On one shovel
11 мая 2018
Next, install metal pillars 50×50 millimeters. To fix the pillars, they are poured with a cement mortar (4 shovels of sand are taken on one shovel of cement).
Next, install metal pillars 50×50 millimeters. To fix the pillars, they are poured with a cement mortar (4 shovels of sand are taken on one shovel of cement).