Gravel recommends 5-10

08 мая 2018 Рубрика: Утепление

Consumption for 1 m3 of concrete: brand cop 400-185 kg, gravel — 1787 kg, water — 81 liters. Gravel recommends 5-10 mm fractions.

The technology of laying pipeline is no different from laying sewer small -piece concrete pipes.

Последние записи