Bridges, reducing the overlap
27 апреля 2018
It was decided to use multi -axial modular trailers with computer control (SPMT) to move old bridges to the place of destruction. The use of powerful trailers made it possible to simultaneously remove both bridges, reducing the overlap of the road to once for 6 hours in an unexplored period of time.



