Zero degrees, and plaster
06 апреля 2018
Winter construction involves the use of winter workwear that can be bought on the site
Despite the above, not everything can be built in winter. So, the pillow for the foundation dries only at a temperature above zero degrees, and plaster is not possible at all without heating, the speed of construction in winter is also lower due to a shorter day and severity of work in frost.



